General Condition of Contract in Construction: Essential Guide and Best Practices

Written by Chris Gibson | Oct 3, 2024 1:19:08 PM

 

Table of Contents

 

Understanding General Condition of Contract in Construction Projects

General conditions of contract in construction refers to the indirect expenses and overhead costs associated with a project.

  • These expenses are not directly related to the construction work itself, but rather include administrative costs, bonds, equipment rental, and temporary utilities.

  • General conditions are essential for ensuring a safe and efficient construction site.

  • They define the roles, responsibilities, and contractual obligations of contracting parties, preventing misunderstandings and disputes.

Before you come to the point of dealing with general conditions, you have to bid on and win projects. If you'd like to have an easy and time-saving bidding experience, check out QuestCDN to find and bid on the right projects.

What are General Conditions vs. General Requirements?

In construction, General Conditions and General Requirements refer to different components of a project’s overhead costs, which are crucial for project management and execution. Here's a breakdown of each:

General Conditions
These refer to the indirect costs associated with a construction project that support the overall project execution but are not directly tied to specific construction tasks. They cover the expenses needed to manage and facilitate the project. Examples include:

- Project management and supervision: Salaries for the project manager, site superintendent, and administrative staff.
- Temporary facilities: On-site offices, storage, toilets, and fencing.
- Utilities: Water, electricity, and temporary lighting required during construction.
- Safety measures: Safety equipment, site security, and safety signage.
- Site cleanup and waste disposal: Regular site maintenance and removal of debris.
- Permits and fees: Costs for obtaining necessary permits and inspections.

General Requirements
These encompass the contractual obligations set by the project owner that a contractor must fulfill to complete the project. These requirements are typically outlined in the contract documents and specify project standards and processes. Examples include:

- Project schedules: Establishing timelines for completion and adherence to deadlines.
- Quality standards: Requirements for workmanship, materials, and adherence to safety protocols.
- Submittals and approvals: Submitting drawings, samples, and product data for approval before installation.
- Documentation: Maintaining logs, meeting minutes, and progress reports.
- Environmental compliance: Adhering to regulations related to environmental protection, such as dust control or erosion management.

Key Differences
- General Conditions focus on the logistical and administrative aspects needed to keep a project running smoothly.
- General Requirements deal with the specific contractual standards, procedures, and project management obligations that must be met.

Understanding the distinction helps in project budgeting and ensures that both project costs and contractual obligations are adequately addressed.

Essential Elements of General Conditions of Contract

General conditions in construction projects encompass a wide range of essential elements that are crucial for the successful execution of the project. These elements are crucial for maintaining the project timeline and ensuring effective cost control. These elements can be broadly categorized into several key areas, including:

  1. Administrative Costs: These include expenses related to project management, such as salaries for project managers, site supervisors, and administrative staff. Effective site management ensures that the project runs smoothly and efficiently.

  2. Temporary Facilities and Utilities: This covers the cost of setting up temporary structures like site offices, storage units, and restrooms, as well as providing temporary utilities such as water, electricity, and internet. These facilities are vital for maintaining a functional construction site.

  3. Safety and Security: Ensuring the safety and security of the construction site is paramount. This includes costs for safety equipment, security personnel, and insurance policies like general liability insurance. A safe site minimizes the risk of accidents and legal issues.

  4. Permits and Fees: Obtaining the necessary building permits and paying associated fees is a critical step in any construction project. These permits ensure that the project complies with local regulations and standards.

  5. Equipment and Material Handling: This involves the rental or purchase of equipment needed for the project, as well as the costs associated with transporting and storing materials. Efficient handling of equipment and materials can significantly impact project timelines and costs.

By understanding and managing these essential elements, contractors can ensure that their construction projects are completed on time, within budget, and with effective cost control.

Related: Mastering the Schedule of Values: A Guide for Construction Projects.

Estimating General Condition Costs

  • Estimating general conditions costs requires a deep understanding of the project, potential variables, and accurate cost estimation.

  • Contractors use standard general conditions as a baseline, reference the project manual, incorporate project-specific conditions, and use historical job costing data. Indirect costs, such as project management and permits, are also considered in this process.

  • The best way to calculate general conditions costs is to look at past projects and review historical data from similar projects of similar duration.

  • If no past project data is available, estimate each part of the general conditions separately and multiply by the expected duration of the project.

 

Related: How to Master Construction Estimating.

Payment Terms and Change Orders

  • Payment terms describe the payment schedule, invoicing, retainage, and final payment.

  • Major aspects include payment schedule, invoicing, retainage, final payment, and delayed payment consequences.

  • Change orders detail the process for altering the original scope of the contract.

  • Major aspects include change order procedure, cost adjustment, work stoppage, documentation, and dispute resolution.

Construction Project Management and General Conditions

Construction project management involves planning, organizing, and controlling resources to achieve specific goals.

General conditions are a critical component of construction project management, as they impact project costs, timelines, and quality. Accurate project documentation is crucial for ensuring compliance and tracking project progress. These general conditions are detailed within the construction contract, which outlines the framework of the project, including project management, material handling, and compliance measures.

Effective construction project management requires accurate estimation and tracking of general conditions costs.

Project managers must balance the needs of various stakeholders, including contractors, owners, and workers.

Related: How Technology Can Help You Review New Projects.

General Conditions and Overhead Costs

  • General conditions are not considered overhead, but rather costs attached to the entire project.

  • Overhead costs are general costs of doing business that is incurred by all contractors and is not tied to a specific project.

  • General conditions are costs incurred that lead to project success, while overhead are costs incurred that lead to company success.

  • Contractors must distinguish between general conditions and overhead costs to ensure accurate cost allocation and project management.

Best Practices for General Conditions

  • Use historical data from previous projects to estimate general conditions costs.

  • Break down general conditions into individual components and estimate each separately.

  • Consider using project management software to track and manage general conditions costs, including real-time cost tracking.

  • Regularly review and update general conditions estimates to ensure accuracy and project profitability.

Related: 7 Tips to Manage a Busy Schedule When Searching for New Projects.

Request for Proposal (RFP) and General Conditions

A Request for Proposal (RFP) is a document that outlines the requirements, scope of work, and specifications of a construction project.

General conditions are typically included in the RFP to provide contractors with a clear understanding of the project’s scope and requirements.

Contractors must carefully review the RFP and general conditions to ensure they understand the project’s requirements and can provide an accurate estimate.

Construction Proposal and Estimate Templates

Construction proposal and estimate templates are essential tools for contractors and project managers to ensure that all necessary information is included in the proposal and estimate. These templates can help streamline the process and reduce the risk of errors or omissions.

A well-structured construction proposal template typically includes:

  1. Project Overview: A brief description of the project, including its scope, objectives, and key project milestones. This provides a clear understanding of what the project entails.

  2. Scope of Work: Detailed information about the tasks and activities that will be performed, including specific deliverables and timelines. This helps in setting clear expectations for all parties involved.

  3. Cost Estimates: A breakdown of the estimated costs for labor, materials, equipment, and general conditions. Accurate cost estimates are crucial for budgeting and financial planning.

  4. Terms and Conditions: The legal and contractual terms that govern the project, including payment terms, warranties, and dispute resolution procedures. This section ensures that all parties are aware of their rights and obligations.

  5. Signatures: Spaces for the signatures of the contractor and the client, indicating their agreement to the terms outlined in the proposal.

Using standardized templates not only saves time but also ensures consistency and accuracy in the documentation process. This, in turn, helps project managers and contractors to present professional and comprehensive proposals to their clients.

Related: The Importance of Reviewing Projects Even When You're Busy.

Tracking General Conditions with Project Management Tools

  • Project management software can help contractors track and manage general conditions costs.

  • Tools such as dashboards, reports, and alerts can provide real-time visibility into project costs and performance.

  • Contractors can use project management software to automate tasks, streamline workflows, and improve collaboration.

Dispute Resolution and Project Closeout

Dispute resolution and project closeout are critical components of the construction process. Dispute resolution involves resolving any disagreements or disputes that may arise during the project, while project closeout involves completing all necessary tasks to finalize the project.

Dispute Resolution:

  1. Early Identification: The sooner a dispute is identified, the easier it is to resolve. Regular communication and documentation can help in early detection of potential issues.

  2. Negotiation: Many disputes can be resolved through direct negotiation between the parties involved. This approach is often quicker and less costly than formal legal proceedings.

  3. Mediation and Arbitration: If negotiation fails, mediation or arbitration can be effective alternatives. These methods involve a neutral third party who helps facilitate a resolution.

  4. Documentation: Keeping detailed records of all communications, agreements, and changes to the project can provide valuable evidence in the event of a dispute.

Related: 5 Reasons Why You Should Switch to Digital Bidding.

Project Closeout:

  1. Final Inspections: Conduct thorough inspections to ensure that all work has been completed to the required standards and specifications.

  2. Punch List: Create a punch list of any remaining tasks or corrections that need to be addressed before the project can be considered complete.

  3. Documentation: Compile all project documentation, including permits, warranties, and as-built drawings, and provide them to the client.

  4. Final Payment: Ensure that all financial matters are settled, including final payments to subcontractors and suppliers.

  5. Client Handover: Officially hand over the project to the client, including a final walkthrough and review of all completed work.

By effectively managing dispute resolution and project closeout, contractors can ensure a smooth and successful completion of their construction projects, leading to satisfied clients and a strong reputation in the construction industry.

General Conditions in Construction Contracts

General conditions are an essential part of construction contracts, outlining the roles and responsibilities of all parties involved, including the general contractor, subcontractors, and project owners. They provide a framework for project management, including communication protocols, documentation procedures, and dispute resolution processes.

In a construction contract, general conditions set the stage for how the project will be executed and managed. They detail the expectations for each party, ensuring that everyone understands their duties and obligations. For example, the general contractor is typically responsible for overall project coordination, while subcontractors handle specific tasks such as electrical work or plumbing.

Communication protocols outlined in the general conditions ensure that there is a clear and consistent flow of information among all stakeholders. This includes regular progress meetings, updates, and reports that keep everyone informed about the project’s status and any potential issues.

Documentation procedures are also a critical aspect of general conditions. They specify how project documents, such as permits, inspection reports, and change orders, should be handled and maintained. Proper documentation is essential for tracking progress, managing costs, and resolving disputes.

Speaking of disputes, general conditions often include detailed procedures for dispute resolution. This can involve steps such as negotiation, mediation, or arbitration, providing a structured approach to resolving conflicts without resorting to litigation.

By clearly defining these elements, general conditions help to create a well-organized and efficient construction project, minimizing misunderstandings and ensuring that all parties work together towards a successful outcome.

Construction Project Success Factors

Construction project success is often determined by a combination of factors, including effective project management, clear communication, and accurate cost estimation. General conditions play a crucial role in ensuring the success of a construction project. Here are some key success factors to consider:

  1. Clear Project Scope: A well-defined project scope is essential for ensuring that all stakeholders are on the same page. General conditions should clearly outline the project’s objectives, timelines, and deliverables. This clarity helps in setting realistic expectations and avoiding scope creep.

  2. Effective Communication: Communication is key to successful project management. General conditions should establish clear communication protocols, including regular meetings, progress reports, and issue resolution procedures. This ensures that everyone involved is informed and any issues are promptly addressed.

  3. Accurate Cost Estimation: Accurate cost estimation is critical for ensuring that a construction project is completed within budget. General conditions should include a detailed breakdown of costs, including indirect costs, temporary utilities, and building permits. This helps in financial planning and avoiding budget overruns.

  4. Risk Management: Construction projects are inherently risky, and general conditions should include provisions for risk management, including insurance, bonding, and contingency planning. Identifying potential risks early and having a plan in place can mitigate their impact on the project.

  5. Quality Control: General conditions should establish quality control measures, including inspection and testing procedures, to ensure that the project meets the required standards. Consistent quality checks help in maintaining the integrity of the construction work.

  6. Safety Protocols: Safety is a top priority on any construction site, and general conditions should include safety protocols, including personal protective equipment, first aid facilities, and emergency response procedures. A safe work environment reduces the risk of accidents and enhances productivity.

  7. Environmental Compliance: Construction projects must comply with environmental regulations, and general conditions should include provisions for environmental compliance, including waste management and pollution control. Adhering to these regulations helps in avoiding legal issues and promoting sustainability.

By considering these success factors, construction project managers can ensure that their projects are completed on time, within budget, and to the required quality standards.

Related: Why Virtual Bid Openings are Better Than Traditional Openings.

Conclusion and Next Steps

In conclusion, general conditions are a critical component of construction project management. They provide a framework for managing the project, including site management, project management, and cost estimation. By understanding the different types of costs included in general conditions, construction project managers can ensure that their projects are completed successfully.

To take your construction project management skills to the next level, consider the following next steps:

  1. Develop a Comprehensive Project Plan: Use general conditions as a starting point to develop a comprehensive project plan that includes all aspects of the project, including scope, timelines, budgets, and resources. A detailed plan serves as a roadmap for the entire project.

  2. Establish Clear Communication Protocols: Develop clear communication protocols, including regular meetings, progress reports, and issue resolution procedures, to ensure that all stakeholders are informed and engaged throughout the project. Effective communication fosters collaboration and transparency.

  3. Conduct Regular Cost Estimation and Budgeting: Regularly review and update cost estimates and budgets to ensure that the project is on track and that any changes or issues are addressed promptly. This proactive approach helps in managing project costs effectively.

  4. Implement Risk Management Strategies: Develop and implement risk management strategies, including insurance, bonding, and contingency planning, to mitigate potential risks and ensure project success. Being prepared for uncertainties can save time and resources.

  5. Monitor and Control Quality: Establish quality control measures, including inspection and testing procedures, to ensure that the project meets the required standards. Consistent quality monitoring ensures that the final output is up to the mark.

By following these next steps, construction project managers can ensure that their projects are completed successfully and that they achieve their desired outcomes. Effective management of general conditions is key to delivering high-quality construction projects that meet client expectations and industry standards.